dc2scale Castres CAS1
CAS1 is DC2SCALE's Edge site in Castres, in the Tarn department. 10 MVA are available immediately, across 800 m² of IT rooms, for your GPU clusters and training workloads.
10 MVA available immediately
800 m² of IT rooms
4,800 m² campus in total
An Edge site chosen for available power
Our Edge sites are chosen for available power and room to extend. In Castres, the land is secured: a 4,800 m² campus, including an 800 m² data center, with 10 MVA available immediately. In total, DC2SCALE has 40 MW of IT power available immediately in France, on more than 50 MVA of connected power: 36 MVA in the Paris region, 10 MVA in Castres and 5 MVA in Lille.
An existing campus, brought up to standard
The Castres campus is being renovated into a colocation and cluster hosting data center, building on its existing connections.
Connections already in place
The campus already has high-voltage and telecom connections, which carry the 10 MVA available.
10 MVA available immediately
Up to 1 MW, your room is delivered in 4 to 8 weeks; beyond that, in 3 months. The engineer who calls you back tells you the power you can reserve for your project.
:quality(65))
Discover the technical specifications
Access all the technical information of our data centers: power, connectivity, redundancy, and energy efficiency. Compare their configurations and download detailed sheets to accurately evaluate each site.
Build tomorrow's infrastructure.
Host your clusters where power is available, with an engineer who answers within 48 business hours.
:quality(50))