Sized to your subscribed load
Power feed, redundancy, generators and fuel autonomy, sized for the power you reserve.
We host your GPUs in France, from a few racks to several megawatts. The land is secured, the equipment is in stock and our works team is ready: the first tranche is delivered in 4 to 8 weeks.
Pick a hardware type to start.
Power feed, redundancy, generators and fuel autonomy, sized for the power you reserve.
Chilled water and free cooling across our sites. Rear-door, direct-to-chip or immersion depending on what you deploy.
DC2SCALE teams on site, 24/7 on-call rota, badge and biometric access.
:quality(65))
In a classic colocation room, the limit is floor space. With GPU racks above 100 kW, the limit becomes the power and cooling available per square metre.
Our rooms are built for racks at 150 kW and above: power distribution and cooling are sized at construction.
Rear-door, direct-to-chip or immersion: the architecture is defined with you during the technical study.
Our PAR9 site in the Paris region is connected at 36 MVA and accepts racks well above 150 kW.
Each rack holds 72 Rubin GPUs and 36 Vera CPUs and draws about 190 to 230 kW. NVIDIA has been shipping it since the second half of 2026.
Vera Rubin is fully liquid-cooled, directly on the chips, with a 45 °C water inlet. The PAR9 cooling loop accepts this temperature.
NVIDIA plans Vera Rubin Ultra in the Kyber rack for the second half of 2027, at about 600 kW per rack powered by 800 VDC. PAR9 can host these racks.
Peering, carrier interconnection, proximity to your teams and your customers. Suited to inference and production.
More available power, more favourable energy costs and headroom for the next tranches. Suited to training and long-term deployments.
Indexed on the market
Electricity consumed is rebilled monthly at the market spot price plus market, with no multi-year smoothing.
PUE cap
The PUE is contractually capped at 1.35: technical equipment consumption above this threshold is borne by us.
What you reserve
The contract covers IT power made available at all times. Energy consumed is rebilled separately, on meter readings.
Your room does not wait for a site, for its equipment to be manufactured or for a team to be hired.
The sites that will host your cluster are already secured and connected: 36 MVA in the Paris region at our PAR9 site, 10 MVA in Castres and 5 MVA in Lille, for 40 MW of IT power available immediately.
Chillers, gas and diesel generators, UPS systems and battery racks, transformers, raised floor, access control and building management systems are in stock in our logistics and reuse centres in western and northern France, in addition to our regular stock in the Paris region.
Our works team of about 50 employees, on permanent and apprenticeship contracts, fits out your room: power distribution, cooling and room infrastructure. It is available to start your project.
The configurator works out power, density and rack count from your hardware. The estimate takes five minutes.
Within 48 working hours, with the available capacity, the site and the delivery date.
400 kW to 1 MW in 4 to 8 weeks. Beyond that, 3 months. Your teams get access from delivery.
DC2SCALE operates its own datacenters with its own teams, and its works team fits out the rooms. The estimate is available without an NDA and an engineer answers your request within 48 business hours.

Give the target power and the timeline. Your sales contact calls you back within 48 business hours, arranges the site visit and signs an NDA before the discussion if your project requires it.
In a few minutes the configurator gives you the power, the number of racks and the budget range of your project. An engineer then calls you back within 48 working hours.
:quality(50))