AI clusters

Next-Generation AI-Native Datacenters for your GPU clusters

We host your GPUs in France, from a few racks to several megawatts. The land is secured, the equipment is in stock and our works team is ready: the first tranche is delivered in 4 to 8 weeks.

Estimate your cluster's power

NVIDIA
Vera Rubin NVL72 72 GPUs per rack, 220 kW
Vera Rubin Ultra NVL144 (Kyber) 144 GPUs per rack, 600 kW
GB300 NVL72 72 GPUs per rack, 140 kW
GB200 NVL72 72 GPUs per rack, 132 kW
HGX B300 40 GPUs per rack, 72 kW
HGX B200 40 GPUs per rack, 65 kW
HGX H200 48 GPUs per rack, 61 kW
HGX H100 48 GPUs per rack, 48 kW
RTX PRO 6000 Server 80 GPUs per rack, 63 kW
Instinct MI455X (Helios) 72 GPUs per rack, 235 kW
Instinct MI355X 80 GPUs per rack, 112 kW
Instinct MI325X 40 GPUs per rack, 65 kW
Network, storage, CPU nodes, other hardware
  • Mellanox Quantum-X800 InfiniBand Counted per rack, 15 kW
  • Mellanox Spectrum-X Ethernet Counted per rack, 12 kW
  • Baie stockage Counted per rack, 8 kW
  • Baie réseau et management Counted per rack, 6 kW
  • Baie nœuds CPU Counted per rack, 12 kW
Other hardware kW per rack racks

Your configuration

Pick a hardware type to start.

Configure your cluster

The offer in figures

Capacity

40 MW IT available immediately, on more than 50 MVA of connected power

Density

150 kW per rack, a common density on our sites

Lead time

4 to 8 weeks for a first tranche up to 1 MW

Energy

1.35 PUE contractually capped

Density

One GB300 rack draws as much as ten classic colocation racks

Rangée de baies haute densité dans un datacenter DC2SCALE
The situation

Power becomes the main constraint

In a classic colocation room, the limit is floor space. With GPU racks above 100 kW, the limit becomes the power and cooling available per square metre.

Our answer

Rooms designed for AI workloads from the outset

Our rooms are built for racks at 150 kW and above: power distribution and cooling are sized at construction.

Cooling

Liquid cooling adapted to your hardware

Rear-door, direct-to-chip or immersion: the architecture is defined with you during the technical study.

We already deploy their technologies

  • NVIDIA
  • Dell
  • Lenovo
Energy

Electricity rebilled at actual cost, PUE capped by contract

Actual cost

Utility rate

Electricity rebilled at our utility's actual rate

Electricity consumed is rebilled monthly at the rate we actually pay our utility, with supporting documents, plus a markup set in the contract.

1.35

PUE cap

Datacenter overhead capped at 1.35

The PUE is contractually capped at 1.35: technical equipment consumption above this threshold is borne by us.

MW

What you reserve

Reserved power, energy billed on meter readings

The contract covers IT power made available at all times. Energy consumed is rebilled separately, on meter readings.

Handover

Everything is ready before your order

Your room does not wait for a site, for its equipment to be manufactured or for a team to be hired.

Sites already connected to the grid

The sites that will host your cluster are already secured and connected: 36 MVA in the Paris region at our PAR9 site, 10 MVA in Castres and 5 MVA in Lille, for 40 MW of IT power available immediately.

Your room's equipment, in stock

Chillers, gas and diesel generators, UPS systems and battery racks, transformers, raised floor, access control and building management systems are in stock in our logistics and reuse centres in western and northern France, in addition to our regular stock in the Paris region.

An in-house works team

Our works team of about 50 employees, on permanent and apprenticeship contracts, fits out your room: power distribution, cooling and room infrastructure. It is available to start your project.

Lead times

Three steps to power-on

Illustration d'une sélection en ligne
1.

You describe your hardware

The configurator works out power, density and rack count from your hardware. The estimate takes five minutes.

Illustration d'un message reçu
2.

An engineer calls you back

Within 48 working hours, with the available capacity, the site and the delivery date.

Illustration d'une mise en service
3.

You deploy

400 kW to 1 MW in 4 to 8 weeks. Beyond that, 3 months. Your teams get access from delivery.

No middleman

You deal directly with the datacenter operator

DC2SCALE operates its own datacenters with its own teams, and its works team fits out the rooms. The estimate is available without an NDA and an engineer answers your request within 48 business hours.

Technicien DC2SCALE pendant une livraison d'équipements sur site

Projects of 1 MW and more

A multi-megawatt project is prepared with a named contact

Give the target power and the timeline. Your sales contact calls you back within 48 business hours, arranges the site visit and signs an NDA before the discussion if your project requires it.

Your sales contact
Christian MARTINS
Christian MARTINS Business Developer
Target power*
Target power-on date (optional)
Your cluster

Describe your cluster project

In a few minutes the configurator gives you the power, the number of racks and the budget range of your project. An engineer then calls you back within 48 working hours.

Équipements de datacenter chargés pour livraison sur site